Click on link in Ref’ce no. Column to display document or PDF Icon for PDF Version.

List of references to the Timetabling Committee

from 1994 until 14.04.05

 

Please be patient while this list loads.

Note 1:

The “Date” column indicates (if shown in brackets) the month that the reference was notified to the Committee;
 or, if not in brackets, it indicates the date of the hearing

 

Note 2:

References to the Timetabling Committee were registered with prefix ‘ttc’.  Those which were taken forward on 15 April 2005
for hearing by a Timetabling Panel were re-registered with prefix ‘TTP’.  Both registration numbers are shown where appropriate.
Details of such references are also found on the ‘new’ Access Disputes Committee site.

 

 

Ref’ce no.

PDF File

Date

Reference from

Subject

ttc1

01.12.94

South Wales & West Railway

Application of Rules of the Route (possession times) by Great Western Zone

ttc2

15.12.94

Central Trains

 

Application of Rules of the Plan (sectional running times) by Midland Zone

ttc3

15.12.94

West Anglia Great Northern Railway

Application of Rules of the Route by East Coast Zone

ttc4

 

(Feb. 95)

LTS Rail

Application of Rules of the Plan (Barking resignalling Easter 1995)

(settled out of court)

ttc5

28.06.95

Regional Railways North East

Application of Rules of the Plan (Doncaster-Cleethorpes) by LNE Zone

ttc6

 

(Sep. 95)

Loadhaul

Responses received to bids

(settled out of court)

ttc7

 

(Sep. 95)

Network South Central

Flexing of trains

(settled out of court)

ttc8

 

(Sep. 95)

Network South Central

Rules of the Route

(settled out of court)

ttc9

10.11.95

Regional Railways North East

Application of Rules of the Plan by LNE Zone

ttc10

 

(Feb. 96)

Regional Railways North East

Application of Rules of the Route (at Huncoat) by LNE Zone

(settled out of court)

ttc11

22.03.96

Rail express systems Ltd

Railtrack offer in the first iteration of the Winter 1996 timetable

ttc12

20.05.96

North London Railways

Railtrack offer in the first iteration of the Winter 1996 timetable

ttc13

04.06.96

Great Western Trains

Railtrack's publication of the level 1 Train Regulation Statement

ttc14

18.06.96

West Anglia Great Northern

Railtrack's proposals for the Rules of the Route/Plan for the Summer 1997 timetable

ttc15

 

(May 96)

Regional Railways North East

Railtrack's proposals for the Rules of the Route/Plan for the Summer 1997 timetable

(settled out of court)


ttc16

 

(June 96)

Reference by Central Trains submitted after deadline of 7.6.96.

Application declined

Railtrack decisions in the 2nd iteration offer of the Winter 1996 timetable

ttc17

01.07.96

The Committee sought representations from all Industry Parties regarding an aspect of process

Introduction by Railtrack of significant changes and new material to Section 6 of the Route Compendium.

ttc18

18.10.96

South Wales & West Railway:                        (1)

 

 

                                    (2)

Two elements:

Railtrack decision in the 1st iteration offer of the Summer 1997 timetable

[published as determination No.18]

Insufficient information from Railtrack in respect of offers made to other operators in the 1st iteration, Summer 1997 timetable

[published as determination No.19]

ttc19

(Oct. 96)

Anglia Railways Train Services

Railtrack decision in the 1st iteration offer of the Summer 1997 timetable

(settled out of court)

ttc20

 

(Oct. 96)

North London Railways

Method of application of EMU timing loads in 1st iteration of Summer 1997 Timetable

(settled out of court)

ttc21

22 & 25 .10.96

Thames Trains

Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable

ttc22

25.10.96

Regional Railways North East

Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable

ttc23

 

(Oct. 96)

Central Trains

Railtrack decisions in the 1st iteration offer of the Summer 1997 timetable

(settled out of court)

ttc24

28.10.96

Regional Railways North East

Railtrack’s proposals for extraordinary Possessions in January-March 1997

ttc25

28.10.96

Regional Railways North East

Railtrack’s proposals for Rules of the Route/Plan for the Winter 1997 timetable

ttc26

 

(Oct. 96)

South Wales & West Railway

Access Planning Process: Rules of the Plan for the Winter 1997 timetable

(settled out of court)

ttc27

 

(Feb. 97)

Anglia Railways

Railtrack's decision in 1st iteration of the Winter 1997 timetable

(settled out of court)

ttc28

 

(Feb. 97)

EWS (Rail Express Systems)

Railtrack's decision on Royal Mail services in 1st iteration of the Winter 1997 timetable

(settled out of court)


ttc29

 

(Feb. 97)

North West Regional Railways

Railtrack's decision in 1st iteration of the Winter 1997 timetable:  Access to Crewe CET siding

(settled out of court)

ttc30

 

(Feb. 97)

Railfreight Distribution

Railtrack's (lack of) decision in 1st iteration of the Winter 1997 timetable

(settled out of court)

ttc31

 

(Feb. 97)

Great Western Trains

Railtrack's decision in 1st iteration of the Winter 1997 timetable in regard to some SO services

(settled out of court)

ttc32

 

Regulator's appeal determination

04.03.97

South Wales & West Railway and Railtrack

Railtrack's decision in 1st iteration of the Winter 1997 timetable

(see also AD12)

ttc33

 

(Mar. 97)

English Welsh & Scottish Railway

Railtrack's decision to amend unilaterally an offer previously agreed by EWS (on Kings Lynn line)

(settled out of court)

ttc34

 

(May 97)

Great Western Trains

Railtrack’s proposals for the Summer 1998 Rules of the Route

(settled out of court)

ttc35

12.06.97

Central Trains

Railtrack’s failure to include in its consultation on Rules of the Route a party that was negotiating Access Rights for a relevant Route

ttc36

 

(May 97)

English Welsh & Scottish Railway

Railtrack’s proposals for the Summer 1998 Rules of the Route

(settled out of court)

ttc37

 

(May 97)

Great Eastern Railway and Railtrack

Railtrack’s proposals for the Summer 1998 Rules of the Plan

(withdrawn;  resubmitted as AD15)

ttc38

13.06.97

Regional Railways North East

Railtrack’s Summer 1998/99 National Rules of the Plan document

ttc39

10.10.97

English Welsh & Scottish Railway

Railtrack’s proposals for the Summer 1998 Rules of the Plan (and National Rules of the Plan document)

ttc40

10.10.97

Regional Railways North East

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

ttc41

 

(Sep. 97)

Regional Railways North East

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)

ttc42

 

(Sep. 97)

North London Railways

(Silverlink Trains)

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)


ttc43

 

(Sep. 97)

Anglia Railways

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)

ttc44

 

(Sep. 97)

English Welsh & Scottish Railway

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)

ttc45

 

(Sep. 97)

North Western Trains

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)

ttc46

 

15.10.97

Eurostar (U.K.)

i)    Railtrack’s failure to respond to a Bid

(settled out of court)

ii)   Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(timed out; not submitted

within prescribed time scales)

 

 

Note:

The Committee, having established that (i) Railtrack had now made a response, and that (ii) above was timed out, decided not to issue a determination, but to issue an Extraordinary Note about certain unsatisfactory features that it had detected.

ttc47

 

(Oct. 97)

Virgin Trains (West Coast)

Railtrack’s decision in 1st iteration of the Summer 1998 timetable

(settled out of court)

ttc48

 

(Oct. 97)

Regional Railways North East

Railtrack’s proposals for the Winter 1998 Rules of the Route/Plan:

(settled out of court)

ttc49

 

(Dec. 97)

Eurostar (UK)

Railtrack’s decision in 2nd iteration of the Summer 1998 timetable:

(settled out of court)

ttc50

 

(Dec. 97)

Thameslink Rail

Railtrack’s decision in 2nd iteration of the Summer 1998 timetable:

(settled out of court)

ttc51

 

(Dec. 97)

English Welsh & Scottish Railway

Railtrack’s decision on retimings of services for engineering work:

(settled out of court)

ttc52

 

(Feb. 98)

Great Western Trains

Railtrack’s decision in 1st iteration of the Winter 1998 timetable:

(settled out of court)

ttc53

 

(Feb. 98)

Anglia Railways

Railtrack’s decision in 1st iteration of the Winter 1998 timetable:

(settled out of court)

ttc54

 

(Feb. 98)

Thames Trains

Railtrack’s decision in 1st iteration of the Winter 1998 timetable:

(settled out of court)

ttc55

 

(Apr. 98)

English Welsh & Scottish Railway

Railtrack’s decision in response to a Spot Bid

(settled out of court)

ttc56

 

(May 98)

Wales & West Railway

Railtrack’s decision in 2nd iteration of the Winter 1998 timetable:

(settled out of court)

ttc57

 

(May 98)

Central Trains

Railtrack’s proposals for the Rules of the Route/Plan for 1999/2000:

(settled out of court)

ttc58

09.07.98

English Welsh & Scottish Railway

Railtrack’s National Rules of the Plan (1999)

EWS challenged whether Railtrack had properly complied with Determination 39

ttc59

 

(May 98)

Northern Spirit

Railtrack’s proposals for the Rules of the Route/Plan for 1999/2000:

(settled out of court)

ttc60

 

(Oct. 98)

Eurostar (U.K.)

Railtrack’s decision in 1st iteration of the Summer 1999 timetable:

(settled out of court)

ttc61

 

(Oct. 98)

Great Western Trains

Railtrack’s decision in 1st iteration of the Summer 1999 timetable:

(settled out of court)

ttc62

 

(Oct. 98)

Wales & West

Railtrack’s decision in 1st iteration of the Summer 1999 timetable:

(settled out of court)

ttc63

23.10.98

Anglia Railways

Railtrack’s decision in the 1st iteration of the Summer 1999 timetable regarding Boat Trains to/from Harwich

ttc64

 

(Oct. 98)

English Welsh & Scottish Railway

Railtrack’s decision in 1st iteration of the Summer 1999 timetable:

(settled out of court)

ttc65

 

(Oct. 98)

North Western Trains

Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999:

(settled out of court)

ttc66

 

(Oct. 98)

English Welsh & Scottish Railway

Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999:

(settled out of court)

ttc67

30.10.98

Northern Spirit

Application of Rules of the Plan (Sectional Running Times) by Railtrack N.W.Zone

ttc68

 

(Oct. 98)

Connex South Central

Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999:

(settled out of court)

ttc69

 

(Oct. 98)

Wales & West

Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999:

(settled out of court)

ttc70

 

(Oct. 98)

West Anglia Great Northern

Railtrack’s proposals for the Rules of the Route/Plan for Winter 1999:

(settled out of court)

ttc71

 

(Dec. 98)

Great Western Trains

Railtrack’s decision in 2nd iteration of the Summer 1999 timetable:

(settled out of court)

ttc72

 

(Dec. 98)

Anglia Railways

Railtrack’s decision in 2nd iteration of the Summer 1999 timetable:

(settled out of court)

ttc73

 

(Feb. 99)

Northern Spirit

Railtrack’s decision in 1st iteration of the Winter 1999 timetable:

(settled out of court)

ttc74

 

(May 99)

Eurostar (U.K.)

Railtrack’s decision in 2nd iteration of the Winter 1999 timetable:

(settled out of court)

ttc75

08.06.99

Thameslink Rail

Railtrack’s decision in 2nd iteration of the Winter 1999 timetable:

Standard hour off-peak paths Gatwick – Brighton

ttc76

 

(May 99)

ScotRail Railways

Railtrack’s decision in 2nd iteration of the Winter 1999 timetable:

(settled out of court)

ttc77

 

(May 99)

Great Western Trains

Railtrack’s decision in 2nd iteration of the Winter 1999 timetable:

(settled out of court)

ttc78

 

(May 99)

English Welsh & Scottish Railway

Railtrack’s decision in 2nd iteration of the Winter 1999 timetable:

(settled out of court)

ttc79

 

(Aug. 99)

Northern Spirit

Railtrack’s proposals for the Rules of the Route/Plan for 2000/01:

 

 

As the matters were solely concerned with the Rules for the Winter period 2000/01, the Committee exhorted the parties to continue discussions;  if not resolved, Northern Spirit could bring a reference following publication of the Winter Rules Revisions.

(deferred;  subsequently resubmitted as ttc86)

ttc80

16.09.99

English Welsh & Scottish Railway

Railtrack’s proposals for the Rules of the Route/Plan for the Summer 2000 timetable:

 

 

The Committee did not make a determination but issued an Extraordinary Note about certain unsatisfactory features that it had detected.  The Parties were instructed to resume discussions on the basis of a common understanding of information relating to Rules of the Route, Railtrack’s proposed timings and the working arrangements at the affected locations.  In the event of the Parties failing to resolve the dispute they were advised to make a further jointly agreed submission, with a request that the Dispute Hearing be reconvened.

ttc81

 

(Aug. 99)

Great Western Trains

Railtrack’s decision on Draft Timetable for Summer 2000:

(settled out of court)

ttc82

15.09.99

Great Western Trains

Railtrack’s decision on Draft Timetable for Summer 2000:

Paddington - Worcester services

ttc83

 

(Sep. 99)

Thames Trains

Railtrack’s decision on Draft Timetable for Summer 2000:

(settled out of court)

ttc84

 

(Nov. 99)

Eurostar (U.K.)

Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01:

(settled out of court)

ttc85

21.12.99

Great Western Trains

Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01:

Pathing and headways

ttc86

 

(Dec. 99)

Northern Spirit

Railtrack’s proposals for the Rules of the Route/Plan for Winter 2000/01:

(settled out of court)

ttc87

20.12.99 & 27.01.00

English Welsh & Scottish Railway

Railtrack’s decision for the Rules of the Route/Plan for Winter 2000/01:

Engineering allowances:  Camden - Rugby

ttc88

05.01.00

Rail Express Systems

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

Weekly service Waterloo –Salisbury

ttc89

12.01.00

Thames Trains

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

Paddington - Oxford service

ttc90

 

(Dec. 99)

Great North Eastern Railway

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

(settled out of court)

ttc91

12.01.00

Great Western Trains

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

Paddington - Oxford - Worcester service

ttc92

 

(Dec. 99)

Freightliner

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

(settled out of court)

ttc93

11.01.00

Great North Eastern Railway

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

Flexing of services to Glasgow

ttc94

 

(Dec. 99)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

(settled out of court)

ttc95

17.01.00

Northern Spirit

Railtrack’s decision in respect of Bids for the Summer 2000 timetable:

Application of Performance allowances

ttc96

 

(Apr. 00)

Thames Trains

Railtrack’s decision in respect of Bids for the Winter 2000/01 timetable:

(settled out of court)

ttc97

 

(Apr. 00)

Wales & West Passenger Trains

Railtrack’s decision in respect of Bids for the Winter 2000/01 timetable:

(settled out of court)

ttc98

 

(July 00)

Anglia Railways

Train Regulation Statements:

Alleged that Railtrack was not complying with the provisions of Condition H11:

(settled out of court)

ttc99

 

(July 00)

Connex South Eastern

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc100

 

(July 00)

The Chiltern Railway Company

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc101

 

(July 00)

West Anglia Great Northern

Railtrack’s proposals for the Rules of the Route/Plan 2001/02:

(withdrawn by referrer)

ttc102

 

(July 00)

Silverlink

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc103

 

(July 00)

Great Western Trains

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc104

 

(July 00)

Wales & West Passenger Trains

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc105

07.12.00

Freightliner

Railtrack’s proposals for the Rules of the Route 2001/02

ttc106

07.12.00

English Welsh & Scottish Railway

Railtrack’s proposals for the Rules of the Route 2001/02:

ttc107

 

(Aug. 00)

Eurostar (U.K.)

Railtrack’s proposals for the Rules of the Route 2001/02:

(settled out of court)

ttc108

 

(Aug. 00)

Thames Trains

Railtrack’s decision to reject services for the Summer 2001 timetable:

(withdrawn by the referrer)

ttc109

01.11.00

North Western Trains

Railtrack’s decision in respect of the Rules of the Plan 2001/02

ttc110

01.11.00

Northern Spirit

Railtrack’s decision in respect of the Rules of the Plan 2001/02

ttc111

 

(Oct. 00)

Thames Trains

Railtrack’s decision in respect of Bids for the Summer 2001 timetable:

(settled out of court)

ttc112

 

(Dec. 00)

Great Western Trains

Railtrack’s decision in respect of Bids for the Summer 2001 timetable:

(settled out of court)

ttc113

 

(Dec. 00)

Freightliner

Railtrack’s decision in respect of Bids for the Summer 2001 timetable:

(settled out of court)

ttc114

 

(Dec. 00)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Summer 2001 timetable:

(settled out of court)

ttc115

 

(Mar. 01)

Great Western Trains

Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable:

(settled out of court)

ttc116

 

(Mar. 01)

Thameslink Rail

Railtrack’s decision in respect of a Spot Bid:

(settled out of court)

ttc117

 

(Mar. 01)

Great Western Trains

Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable:

(settled out of court)

ttc118

 

(May 01)

North Western Trains

Railtrack’s decision in respect of the National Rules of the Plan (section3, clause 5.3) for the 2002 timetable:

(settled out of court)

ttc119

 

(May 01)

Arriva Trains Northern

Railtrack’s decision on proposed amendments to the Rules of the Route 2001/02:

(settled out of court)

ttc120

 

(June 01)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Winter 2001/02 timetable:

(settled out of court)

ttc121

 

(July 01)

Great Western Trains

Railtrack’s decision in respect of a proposal for possessions at Reading on 28/29.7.01:

(settled out of court)

ttc122

 

(July 01)

Connex South Central

Railtrack’s decision to withdraw section 3 guidelines for granting possessions;  Southern Zone Rules of the Route 2002/03:

(settled out of court)

ttc123

 

(July 01)

Connex South Eastern

Railtrack’s decision to withdraw section 3 guidelines for granting possessions;  Southern Zone Rules of the Route 2002/03:

(settled out of court)

ttc124

 

(Aug. 01)

Thames Trains

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc125

 

(Aug. 01)

Great Western Trains

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc126

 

(Aug. 01)

Central Trains

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc127

 

(Aug. 01)

North Western Trains

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc128

 

(Aug. 01)

Great North Eastern Railway

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc129

08.02.02

English Welsh & Scottish Railway

Railtrack’s decision in respect of the Rules of the Route/Plan for 2002/03 [Anglo-Scottish Maintenance Strategy on the West Coast Main Line]:

(settled out of court)

ttc130

 

(Aug. 01)

Freightliner

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc131

 

(Aug. 01)

Arriva Trains Northern

Railtrack’s decision in respect of version 2 of the Rules of the Route for 2002/03:

(settled out of court)

ttc132

 

Regulator's appeal determination

30.11.01

Eurostar (U.K.)

Railtrack’s decision to suspend Train Slots for Eurostar night services in the Draft Timetable for Summer 2002:

ttc133

 

(Oct. 01)

Rail Express Systems

Railtrack’s decision in respect of a Spot Bid for 1S06 Royal Mail train:

(settled out of court)

ttc134

 

(Oct. 01)

Thames Trains

A Railtrack ‘decision’ in respect of the Draft Timetable for Summer 2002:

(settled out of court)

ttc135

 

(Nov. 01)

South Central

A Railtrack ‘decision’ in respect of the Draft Timetable for Summer 2002:

(settled out of court)

ttc136

14.03.02

Arriva Trains Northern

Railtrack’s decision in respect of the Rules of the Route/Plan for Winter 2002/03

ttc137

 

(Dec. 01)

Connex South Eastern

Railtrack’s decision in respect of Bids for the Summer 2002 timetable:

(settled out of court)

ttc138

 

(Dec. 01)

Thameslink Rail

Railtrack’s decision in respect of Bids for the Summer 2002 timetable:

(settled out of court)

ttc139

 

(Dec. 01)

ScotRail Railways

Railtrack’s decision in respect of Bids for the Summer 2002 timetable:

(settled out of court)

ttc140

 

(Dec. 01)

Great Western Trains

Railtrack’s decision in respect of Bids for the Summer 2002 timetable:

(settled out of court)

ttc141

 

(Dec. 01)

Wessex Trains

Railtrack’s decision in respect of the use of Platform 0 at Cardiff Central for the Summer 2002 timetable:

(settled out of court)

ttc142

 

(Dec. 01)

Freightliner

Railtrack’s decision in respect of Bids for the Summer 2002 timetable:

(settled out of court)

ttc143

 

(Mar.02)

Great Western Trains

Railtrack’s decision in respect of changes to the Rules of the Route for September 2002:

(settled out of court)

ttc144

24.05.02

Grand Central Railway

Railtrack’s decision in respect of Bids for the Winter 2002 timetable:

ttc145

 

(Apr.02)

Arriva Trains Northern

Railtrack’s decision in respect of the Rules of the Route/Plan for the Winter Two timetable 2002/03:

(settled out of court)

ttc146

 

(Apr.02)

Central Trains

Railtrack’s decision in respect of Bids for the Winter One timetable 2002/03:

(settled out of court)

ttc147

 

(Apr.02)

Great North Eastern Railway

Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable:

(settled out of court)

ttc148

 

(Apr.02)

Wessex Trains

Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable:

(withdrawn by referrer)

ttc149

 

(Apr. 02)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Winter 2002/03 timetable:

(settled out of court)

ttc150

 

(May 02)

Great Western Trains

Railtrack’s decision in respect of Bids for the Winter 2002 timetable:

(settled out of court)

ttc151

 

(July 02)

Great North Eastern Railway

Railtrack’s decision in respect of the Rules of the Plan for 2003/04:

(settled out of court)

ttc152

 

(July 02)

Great Western Trains

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

(settled out of court)

ttc153

 

(July 02)

ScotRail Railways

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

(settled out of court)

ttc154

 

(July 02)

West Coast Trains

Railtrack’s decision in respect of the Rules of the Route for 2003/04:

(settled out of court)

ttc155

22.10.02

Thames Trains

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

ttc156

 

(July 02)

North Western Trains

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

(settled out of court)

ttc157

 

(July 02)

Silverlink Train Services

Railtrack’s decision in respect of the Rules of the Route for 2003/04:

(settled out of court)

ttc158

 

(July 02)

Central Trains

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

(settled out of court)

ttc159

 

(July 02)

Great North Eastern Railway

Railtrack’s decision in respect of the Rules of the Route for 2003/04:

(settled out of court)

ttc160

 

(July 02)

West Anglia Great Northern

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

(settled out of court)

ttc161

 

20.09.02

Arriva Trains Northern

Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04:

ttc161A

ttc161B


 

Two determinations were issued:

Determination 161A - granted the parties additional time to reach agreement on matters relating to Sections 5 & 7 of the Rules of the Route, and gave specific deadlines by which the parties should refer unresolved issues back to the Committee for determination;

Determination 161B - contained decisions relating to the National Rules of the Plan

ttc161C

25.10.02

Arriva Trains Northern

Unresolved issues relating to Section 5 of the Rules of the Route for 2003/04, referred back in accordance with Determination 161A:

(settled out of court)

ttc162

 

(July 02)

English Welsh & Scottish Railway

Railtrack’s decision in respect of the Rules of the Route/Plan (Version 2) 2003/04:

(settled out of court)

ttc163

 

[not used]

 

 

ttc164

 

(Aug.02)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Winter Two 2002/03 timetable:

(settled out of court)

ttc165

 

(Sept.02)

English Welsh & Scottish Railway

National Rules of the Plan, Section 3:  possession strategy for Dolphingstone:

(settled out of court)

ttc166

 

(Oct.02)

Freightliner

Railtrack’s decision in respect of the Rules of the Route/Plan (Version 3) 2003/04:

(settled out of court)

ttc167

 

(Dec.02)

CrossCountry Trains

Railtrack’s decision in respect of the Rules of the Route (Version 4) 2003/04:

(settled out of court)

ttc168

23.01.03

Grand Central Railway

Railtrack’s decision in respect of Bids for the Summer 2003 timetable:

ttc169

 

(Dec.02)

Great North Eastern Railway

Railtrack’s decision in respect of the Rules of the Route/Plan (Version 4) 2003/04:

(settled out of court)

ttc170

 

(Dec.02)

Arriva Trains Northern

Railtrack’s decision in respect of the Rules of the Route/Plan (Version 4) 2003/04:

(withdrawn by referrer)

ttc171

 

(Dec.02)

Thames Trains

Railtrack’s decision in respect of the Rules of the Route (Version 4) 2003/04:

(withdrawn by referrer)

ttc172

 

(Dec.02)

Freightliner

Railtrack’s decision in respect of Bids for the Summer 2003 timetable:

(withdrawn by referrer)

ttc173

 

(Dec.02)

Great Western Trains

Railtrack’s decision in respect of Bids for the Summer 2003 timetable:

(withdrawn by referrer)

ttc174

 

(Dec.02)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Summer 2003 timetable:

(settled out of court)

ttc175

 

(Apr.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of Rules of the Route (Paddington re-signalling):

(settled out of court)

ttc176

 

(Apr.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable for Anglo-Scottish services:

(settled out of court)

ttc177

 

(Apr.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable for other than Anglo-Scottish services:

(settled out of court)

ttc178

 

(Apr.03)

Freightliner

Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable:

(settled out of court)

ttc179

 

(Apr.03)

Great Western Trains

Network Rail’s decision in respect of Bids for the Winter One 2003/04 timetable:

(settled out of court)

ttc180

04.08.03

ScotRail Railways

Network Rail’s decision in respect of the Rules of the Route for the Winter Two period of the 2003/04 Timetable:

 

 

 

The Committee issued a Note of Extraordinary deliberations to explain why, for technical reasons, it could not issue a formal determination.

ttc181

 

(July 03)

Grand Central Railway

Railtrack’s decision in respect of Bids for the Winter Two 2003/4 timetable:

(settled out of court)

ttc182

29.08.03

Great Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004:

ttc183

 

(July 03)

The Chiltern Railway Co.

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004:

(settled out of court)

ttc184

 

(July 03)

North Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004:

(settled out of court)

ttc185

 

(July 03)

Freightliner

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2004:

(settled out of court)

ttc186

 

(Aug.03)

English Welsh & Scottish Railway

Railtrack’s decision in respect of Bids for the Winter Two 2003/04 timetable:

(settled out of court)

ttc187

 

(Aug.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route/Plan for 2004:

(settled out of court)

ttc188

 

(Aug.03)

Arriva Trains Northern

Network Rail’s decision in respect of the Rules of the Route/Plan for 2004:

(settled out of court)

ttc189

9/28.10.03

Thames Trains

Network Rail’s decision in respect of the Rules of the Route for 2004:

ttc190

10.10.03

Silverlink Train Services

Network Rail’s decision in respect of the Rules of the Route for 2004:

ttc191

23.12.03

Freightliner Heavy Haul

Network Rail’s decision in respect of Bids for the Winter Two 2003/04 timetable:

ttc192

23.09.03

Great North Eastern Railway

Network Rail’s decision in respect of the Rules of the Route/Plan for 2004:

ttc193

 

(Aug.03)

English Welsh & Scottish Railway

Network Rail’s decision in disregard of Condition D3.7.5:  [Note:  after discussion train retimed to satisfaction of all parties]:

(settled out of court)

ttc194

26.09.03

ScotRail Railways

Network Rail’s decision in respect of Bids for the Winter Two 2003/04 timetable:

ttc195

 

(Sep.03)

Freightliner

Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004:

(settled out of court)

ttc196

 

(Sep.03)

Great North Eastern Railway

Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004:

(settled out of court)

ttc197

 

(Sep.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for 2004:

(settled out of court)

ttc198

 

(Dec.03)

CrossCountry Trains

Network Rail’s decision in respect of an amendment to the Rules of the Route for weeks 17-22 at Stafford:

(settled out of court)

ttc199

 

(Dec.03)

Silverlink Train Services (London lines)

Network Rail’s decision in respect of an amendment to the Rules of the Route for the late Spring Bank Holiday 2004:

(settled out of court)

ttc200

 

(Dec.03)

Freightliner

Network Rail’s decision in respect of Bids for the Summer 2004 timetable

(settled out of court)

ttc201

 

(Dec.03)

English Welsh & Scottish Railway

Network Rail’s decision in respect of Bids for the Summer 2004 timetable

(settled out of court)

ttc202

 

(Dec.03)

Freightliner Heavy Haul

Network Rail’s decision in respect of Bids for the Summer 2004 timetable

(settled out of court)

ttc203

29.01.04

Thames Trains

Network Rail’s decision in respect of Bids for the Summer 2004 timetable

ttc204

 

(Jan.04)

CrossCountry Trains

Network Rail’s decision in respect of an amendment to Rules of the Route for 2004:  Periods 4b & 5 (Crewe-Cheadle Hulme)

(settled out of court)

ttc205

04.03.04

English Welsh & Scottish Railway

Adherence to acceptance procedures in respect of a Spot Bid for 7O81:

ttc206

 

(Jan.04)

ScotRail Railways

Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004:

(settled out of court)

ttc207

 

(Jan.04)

ScotRail Railways

Network Rail’s decision in respect of an amendment to the Rules of the Route for 2003/04 (weeks 50 & 51):

(settled out of court)

ttc208

 

(Jan.04)

Freightliner

Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004:

(settled out of court)

ttc209

 

(Jan.04)

Great Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2004:

(settled out of court)

ttc210

 

(Jan.04)

Arriva Trains Northern

Network Rail’s decision in respect of the Rules of the Route/Plan (Version 4) for 2004:

(settled out of court)

ttc211

23.03.04

Freightliner

Network Rail’s decision in respect of short notice additional possessions on the WCML:  weeks 1-8, 2004

ttc212

23.03.04

English Welsh & Scottish Railway

Network Rail’s decision in respect of short notice additional possessions on the WCML:  weeks 1-8, 2004

ttc213

23.03.04

ScotRail Railways

Network Rail’s decision in respect of short notice additional possessions on the WCML:  weeks 1-8, 2004

ttc214

 

(Mar.04)

Silverlink Train Services

Network Rail’s decision in respect of short notice additional possessions on the WCML:  weeks 2 & 4, 2004

(withdrawn by referrer)

ttc215

 

(Mar.04)

North Western Trains

Extended Disruption (Condition H7): Damaged Network at Bootle Branch Jcn

(settled out of court)

ttc216

 

(Feb.04)

Silverlink Train Service

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(lapsed when Silverlink submitted reference NV65 to the Network and Vehicle Change Committee)

ttc217

 

(Feb.04)

Arriva Trains Wales

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc218

 

(Feb.04)

ScotRail Railways

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc219

 

(Feb.04)

Freightliner Heavy Haul

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc220

 

(Feb.04)

Arriva Trains Northern

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc221

 

(Feb.04)

Great Northern Eastern Railway

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc222

 

(Feb.04)

Central Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc223

 

(Feb.04)

North Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc224

 

(Feb.04)

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2005

(settled out of court)

ttc225

 

(Apr.04)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route for WCML, August 2005

(settled out of court)

ttc226

 

(May 04)

ScotRail Railways

Network Rail’s decision in respect of the Rules of the Route (Versions 3 & 4) for 2005

(settled out of court)

ttc227

 

(June 04)

Freightliner

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

(settled out of court)

ttc228

 

(June 04)

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

(settled out of court)

ttc229

 

(June 04)

Arriva Trains Northern

Network Rail’s amendment in accordance with Condition D2.1.9 in respect of section 7 of the Rules of the Route for 2005

(settled out of court)

ttc230

 

(Feb.04)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

(settled out of court)

ttc231

 

(July 04)

English Welsh & Scottish Railway

Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005

(settled out of court)

ttc232

01.09.04

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

ttc233

 

(Aug.04)

West Coast Trains

Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005

(settled out of court)

ttc234

 

(Aug.04)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route for 2005 – additional possessions in weeks 31 & 32

(settled out of court)

ttc235

 

(Aug.04)

Freightliner

Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2005

(settled out of court)

ttc236

 

(Aug.04)

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005, Periods 0, A & B

(settled out of court)

ttc237

 

(Aug.04)

Arriva Trains Northern

Network Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of the Route for 2005

(settled out of court)

ttc238

 

(Aug.04)

North Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 4) for 2005, Periods C & D

(settled out of court)

ttc239

 

(Aug.04)

CrossCountry Trains

 

Network Rail’s decision (on 10 August 2004) in respect of the Rules of the Route for 2005

(settled out of court)

ttc240

 

(Aug.04)

Freightliner Heavy Haul

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc241

 

(Aug.04)

ScotRail Railways

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc242

12.10.04

Great Western Trains

Network Rail’s decision in respect of Bids for the December 2004 timetable

ttc243

 

(Aug.04)

GB Railfreight

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc244

12.10.04

First Great Western Link

Network Rail’s decision in respect of Bids for the December 2004 timetable

ttc245

 

(Aug.04)

Freightliner

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc246

 

(Aug.04)

Wessex Trains

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc247

 

(Aug.04)

South Eastern Trains

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc248

 

(Aug.04)

Arriva Trains Northern

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc249

 

(Aug.04)

Eurostar (U.K.)

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc250

 

(Aug.04)

English Welsh & Scottish Railway

Network Rail’s decision in respect of Bids for the December 2004 timetable

(settled out of court)

ttc251

06.01.05

Great Western Trains

Network Rail’s decision in respect of further changes in weeks 1 & 2 to the Rules of the Route for 2005

ttc252

25.02.05

Arriva Trains Northern

Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Settle & Carlisle line

ttc253

 

25.02.05

Arriva Trains Northern

Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Saltburn branch

 

The Committee commenced a hearing of this reference from Arriva Trains Northern, but it was soon apparent that much of the information that was emerging during the course of the hearing had not been fully shared between the Parties concerned at the appropriate point in time during the consultation period or subsequently.  The Committee therefore instructed the Parties to enter into full and proper dialogue on all relevant issues and, after they had reached a common understanding of the facts, to advise the Committee which elements of the dispute were still unresolved, meanwhile the Committee adjourned the hearing.
The Parties subsequently met and after fully sharing the information available reached a solution of their dispute, and Northern Rail formally asked that the dispute be withdrawn.  This was agreed by the Committee.

ttc254

 

(Dec.04)

CrossCountry Trains

Network Rail’s decision in respect of further changes to the Rules of the Route for 2005
(settled out of court)

ttc255

 

(Dec.04)

LTS Rail

Network Rail’s decision in respect of further changes to the Rules of the Route for 2006

(settled out of court)

ttc256

02.03.05

Silverlink Train Services

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc257

[TTP01]

 

(Dec.04)

Northern Rail (East)

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc258

 

(Dec.04)

New Southern Railway

 

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc259

[TTP02]

 

(Dec.04)

First ScotRail

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc260

 

(Dec.04)

West Anglia Great Northern

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc261

 

(Dec.04)

Heathrow Connect

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc262

[TTP03]

 

[20.07.05]

English Welsh & Scottish Railway

PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 20.07.05

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc263

 

(Dec.04)

Freightliner

 

Network Rail’s decision in respect of the Rules of the Route (Version 2)[for Shenfield – Norwich route] for 2006

(settled out of court)

ttc264

[TTP04]

 

[22.08.05]

Freightliner

PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 22.08.05

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc265

23.02.05

Arriva Trains Wales

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc266

[TTP05]

 

(Dec.04)

Great North Eastern Railway

Network Rail’s decision in respect of items in Section 7 of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc267

 

(Dec.04)

Northern Rail (West)

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc268

 

(Dec.04)

First/Keolis Transpennine Express

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc269

 

(Dec.04)

South Eastern Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc270

 

(Jan.05)

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc271

17.02.05

West Coast Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc272

[TTP06]

 

(Jan.05)

Great North Eastern Railway

Network Rail’s decision in respect of items in Sections 4 & 5 of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc273

[TTP07]

 

(Dec.04)

Freightliner Heavy Haul

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc274

 

(Jan.05)

Eurostar (U.K.)

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc275

11.03.05&29.03.05

Great Western Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

ttc276

 

(Jan.05)

First ScotRail

Network Rail’s decision in respect of Bids for the June 2005 timetable

(settled out of court)

ttc277

 

(Jan.05)

Great Westerrn Trains

Network Rail’s decision in respect of Bids for the June 2005 timetable

(settled out of court)

ttc278

 

(Jan.05)

Eurostar (U.K.)

Network Rail’s decision in respect of Bids for the June 2005 timetable

(settled out of court)

ttc279

 

(Feb.05)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the changes other than twice yearly to the Rules of the Route for 2006

(settled out of court)

ttc280

 

(Feb.05)

Northern Rail (East)

Network Rail’s decision in respect of the changes other than twice yearly to the Rules of the Route for 2006

(settled out of court)

ttc281

[TTP08]

 

(Jan.05)

CrossCountry Trains

Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006

(settled out of court)

ttc282

 

(Feb.05)

Freightliner Heavy Haul

Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006

(settled out of court)

ttc283

 

(Feb.05)

GB Railfreight

Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006

(settled out of court)

ttc284

 

(Feb.05)

CrossCountry Trains

Network Rail’s decision in respect of revised proposals for changes in weeks 11/12 of the Rules of the Route 2005

(settled out of court

ttc285

[TTP09]

 

(Jan.05)

First ScotRail

Network Rail’s decision in respect of changes (in a batching document) to the Rules of the Route for 2006

(settled out of court)

ttc286

 

(Feb.05)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

(settled out of court)

ttc287

[TTP07]

 

(Mar.05)

Freightliner Heavy Haul

Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005

(settled out of court)

ttc288

 

(Mar.05)

Northern Rail (East)

Network Rail’s decision in respect of the Rules of the Route (batching document 3) for 2006

(settled out of court)

ttc289

 

(Mar.05)

English Welsh & Scottish Railway

Network Rail’s decision in respect of the Rules of the Route (batching document 2) for 2006

(settled out of court)

ttc290

[TTP03]

 

[20.07.05]

English Welsh & Scottish Railway

PENDING at 15.04.05; and subsequently heard by a Timetabling Panel on 20.07.05

Network Rail’s decision in respect of the Rules of the Route (batching document 3) for 2006