Click on link
in Ref’ce no. Column to display document or PDF Icon for PDF Version.
List of
references to the Timetabling Committee
from 1994 until 14.04.05
Please be patient while this list loads.
Note 1:
The “Date” column indicates (if shown in
brackets) the month that the reference was notified to the Committee;
or, if not in brackets, it indicates
the date of the hearing
Note 2:
References
to the Timetabling Committee were registered with prefix ‘ttc’. Those which were taken forward on 15 April
2005
for hearing by a Timetabling Panel were re-registered with prefix ‘TTP’. Both registration numbers are shown where
appropriate.
Details of such references are also found on the ‘new’ Access Disputes
Committee site.
|
Ref’ce no. |
PDF File |
Date |
Reference from |
Subject |
|
ttc1 |
01.12.94 |
South Wales
& West Railway |
Application
of Rules of the Route (possession times) by Great Western Zone |
|
|
ttc2 |
15.12.94 |
Central Trains |
Application
of Rules of the Plan (sectional running times) by Midland Zone |
|
|
ttc3 |
15.12.94 |
West Anglia
Great Northern Railway |
Application
of Rules of the Route by East Coast Zone |
|
|
ttc4 |
|
(Feb.
95) |
LTS Rail |
Application of
Rules of the Plan (Barking resignalling Easter 1995) (settled
out of court) |
|
ttc5 |
28.06.95 |
Regional Railways
North East |
Application
of Rules of the Plan (Doncaster-Cleethorpes) by LNE Zone |
|
|
ttc6 |
|
(Sep.
95) |
Loadhaul |
Responses
received to bids (settled
out of court) |
|
ttc7 |
|
(Sep.
95) |
Network
South Central |
Flexing of
trains (settled
out of court) |
|
ttc8 |
|
(Sep.
95) |
Network
South Central |
Rules of the
Route (settled
out of court) |
|
ttc9 |
10.11.95 |
Regional
Railways North East |
Application
of Rules of the Plan by LNE Zone |
|
|
ttc10 |
|
(Feb.
96) |
Regional
Railways North East |
Application of
Rules of the Route (at Huncoat) by LNE Zone (settled
out of court) |
|
22.03.96 |
Rail express
systems Ltd |
Railtrack offer in the first iteration
of the Winter 1996 timetable |
||
|
20.05.96 |
North London
Railways |
Railtrack
offer in the first iteration of the Winter 1996 timetable |
||
|
04.06.96 |
Great Western
Trains |
Railtrack's
publication of the level 1 Train Regulation Statement |
||
|
18.06.96 |
West Anglia
Great Northern |
Railtrack's
proposals for the Rules of the Route/Plan for the Summer 1997 timetable |
||
|
ttc15 |
|
(May
96) |
Regional
Railways North East |
Railtrack's
proposals for the Rules of the Route/Plan for the Summer 1997 timetable (settled
out of court) |
ttc16 |
|
(June 96) |
Reference
by Central Trains submitted after deadline of 7.6.96. Application
declined |
Railtrack
decisions in the 2nd iteration offer of the Winter 1996 timetable |
|
01.07.96 |
The
Committee sought representations from all Industry Parties regarding an
aspect of process |
Introduction
by Railtrack of significant changes and new material to Section 6 of the
Route Compendium. |
||
|
18.10.96 |
South
Wales & West Railway: (1) (2) |
Two
elements: Railtrack
decision in the 1st iteration offer of the Summer 1997 timetable [published as
determination No.18] Insufficient
information from Railtrack in respect of offers made to other operators in
the 1st iteration, Summer 1997 timetable [published as
determination No.19] |
||
|
(Oct. 96) |
Anglia
Railways Train Services |
Railtrack
decision in the 1st iteration offer of the Summer 1997 timetable (settled
out of court) |
||
|
ttc20 |
|
(Oct. 96) |
North London
Railways |
Method of application
of EMU timing loads in 1st iteration of Summer 1997 Timetable (settled
out of court) |
|
22 & 25 .10.96 |
Thames Trains |
Railtrack decisions in the 1st
iteration offer of the Summer 1997 timetable |
||
|
25.10.96 |
Regional
Railways North East |
Railtrack
decisions in the 1st iteration offer of the Summer 1997 timetable |
||
|
ttc23 |
|
(Oct. 96) |
Central Trains
|
Railtrack
decisions in the 1st iteration offer of the Summer 1997 timetable (settled
out of court) |
|
28.10.96 |
Regional
Railways North East |
Railtrack’s
proposals for extraordinary Possessions in January-March 1997 |
||
|
28.10.96 |
Regional
Railways North East |
Railtrack’s
proposals for Rules of the Route/Plan for the Winter 1997 timetable |
||
|
ttc26 |
|
(Oct. 96) |
South Wales
& West Railway |
Access
Planning Process: Rules of the Plan for the Winter 1997 timetable (settled out of court) |
|
ttc27 |
|
(Feb. 97) |
Anglia
Railways |
Railtrack's decision
in 1st iteration of the Winter 1997 timetable (settled
out of court) |
|
ttc28 |
|
(Feb. 97) |
EWS (Rail
Express Systems) |
Railtrack's
decision on Royal Mail services in 1st iteration of the Winter 1997 timetable (settled
out of court) |
ttc29 |
|
(Feb. 97) |
North West
Regional Railways |
Railtrack's
decision in 1st iteration of the Winter 1997 timetable: Access to Crewe CET siding (settled
out of court) |
|
ttc30 |
|
(Feb. 97) |
Railfreight
Distribution |
Railtrack's (lack
of) decision in 1st iteration of the Winter 1997 timetable (settled
out of court) |
|
ttc31 |
|
(Feb. 97) |
Great Western
Trains |
Railtrack's
decision in 1st iteration of the Winter 1997 timetable in regard to some SO
services (settled
out of court) |
|
|
04.03.97 |
South Wales
& West Railway and Railtrack |
Railtrack's
decision in 1st iteration of the Winter 1997 timetable (see also AD12) |
|
|
ttc33 |
|
(Mar. 97) |
English Welsh
& Scottish Railway |
Railtrack's
decision to amend unilaterally an offer previously agreed by EWS (on
Kings Lynn line) (settled
out of court) |
|
ttc34 |
|
(May 97) |
Great Western
Trains |
Railtrack’s
proposals for the Summer 1998 Rules of the Route (settled
out of court) |
|
12.06.97 |
Central Trains |
Railtrack’s failure to include in its
consultation on Rules of the Route a party that was negotiating Access Rights
for a relevant Route |
||
|
ttc36 |
|
(May 97) |
English Welsh
& Scottish Railway |
Railtrack’s
proposals for the Summer 1998 Rules of the Route (settled
out of court) |
|
ttc37 |
|
(May 97) |
Great Eastern
Railway and Railtrack |
Railtrack’s proposals
for the Summer 1998 Rules of the Plan (withdrawn; resubmitted as AD15) |
|
13.06.97 |
Regional
Railways North East |
Railtrack’s Summer 1998/99 National Rules
of the Plan document |
||
|
10.10.97 |
English Welsh
& Scottish Railway |
Railtrack’s
proposals for the Summer 1998 Rules of the Plan (and National Rules of the
Plan document) |
||
|
10.10.97 |
Regional
Railways North East |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable |
||
|
ttc41 |
|
(Sep. 97) |
Regional
Railways North East |
Railtrack’s decision
in 1st iteration of the Summer 1998 timetable (settled
out of court) |
|
ttc42 |
|
(Sep. 97) |
North London
Railways (Silverlink
Trains) |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (settled
out of court) |
ttc43 |
|
(Sep. 97) |
Anglia
Railways |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (settled
out of court) |
|
ttc44 |
|
(Sep. 97) |
English Welsh
& Scottish Railway |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (settled
out of court) |
|
ttc45 |
|
(Sep. 97) |
North Western
Trains |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (settled
out of court) |
|
ttc46 |
|
15.10.97 |
Eurostar (U.K.) |
i) Railtrack’s
failure to respond to a Bid (settled
out of court) ii) Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (timed out; not submitted within
prescribed time scales) |
|
|
|
Note: |
The Committee, having established that (i) Railtrack
had now made a response, and that (ii) above was timed out, decided not to
issue a determination, but to issue an Extraordinary Note about certain
unsatisfactory features that it had detected. |
|
|
ttc47 |
|
(Oct. 97) |
Virgin Trains
(West Coast) |
Railtrack’s
decision in 1st iteration of the Summer 1998 timetable (settled
out of court) |
|
ttc48 |
|
(Oct. 97) |
Regional
Railways North East |
Railtrack’s
proposals for the Winter 1998 Rules of the Route/Plan: (settled
out of court) |
|
ttc49 |
|
(Dec. 97) |
Eurostar (UK) |
Railtrack’s
decision in 2nd iteration of the Summer 1998 timetable: (settled
out of court) |
|
ttc50 |
|
(Dec. 97) |
Thameslink Rail |
Railtrack’s
decision in 2nd iteration of the Summer 1998 timetable: (settled
out of court) |
|
ttc51 |
|
(Dec. 97) |
English Welsh
& Scottish Railway |
Railtrack’s
decision on retimings of services for engineering work: (settled
out of court) |
|
ttc52 |
|
(Feb. 98) |
Great Western
Trains |
Railtrack’s decision
in 1st iteration of the Winter 1998 timetable: (settled
out of court) |
|
ttc53 |
|
(Feb. 98) |
Anglia
Railways |
Railtrack’s
decision in 1st iteration of the Winter 1998 timetable: (settled
out of court) |
|
ttc54 |
|
(Feb. 98) |
Thames Trains |
Railtrack’s
decision in 1st iteration of the Winter 1998 timetable: (settled
out of court) |
|
ttc55 |
|
(Apr. 98) |
English Welsh
& Scottish Railway |
Railtrack’s
decision in response to a Spot Bid (settled out of court) |
|
ttc56 |
|
(May 98) |
Wales & West
Railway |
Railtrack’s
decision in 2nd iteration of the Winter 1998 timetable: (settled
out of court) |
|
ttc57 |
|
(May 98) |
Central Trains |
Railtrack’s
proposals for the Rules of the Route/Plan for 1999/2000: (settled
out of court) |
|
09.07.98 |
English Welsh
& Scottish Railway |
Railtrack’s National Rules of the Plan (1999) EWS challenged whether Railtrack had
properly complied with Determination 39 |
||
|
ttc59 |
|
(May 98) |
Northern
Spirit |
Railtrack’s
proposals for the Rules of the Route/Plan for 1999/2000: (settled
out of court) |
|
ttc60 |
|
(Oct. 98) |
Eurostar
(U.K.) |
Railtrack’s
decision in 1st iteration of the Summer 1999 timetable: (settled
out of court) |
|
ttc61 |
|
(Oct. 98) |
Great Western
Trains |
Railtrack’s
decision in 1st iteration of the Summer 1999 timetable: (settled
out of court) |
|
ttc62 |
|
(Oct. 98) |
Wales &
West |
Railtrack’s
decision in 1st iteration of the Summer 1999 timetable: (settled
out of court) |
|
23.10.98 |
Anglia
Railways |
Railtrack’s
decision in the 1st iteration of the Summer 1999 timetable regarding Boat
Trains to/from Harwich |
||
|
ttc64 |
|
(Oct. 98) |
English Welsh
& Scottish Railway |
Railtrack’s
decision in 1st iteration of the Summer 1999 timetable: (settled
out of court) |
|
ttc65 |
|
(Oct. 98) |
North Western
Trains |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 1999: (settled
out of court) |
|
ttc66 |
|
(Oct. 98) |
English Welsh
& Scottish Railway |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 1999: (settled
out of court) |
|
30.10.98 |
Northern
Spirit |
Application of Rules of the Plan
(Sectional Running Times) by Railtrack N.W.Zone |
||
|
ttc68 |
|
(Oct. 98) |
Connex South
Central |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 1999: (settled
out of court) |
|
ttc69 |
|
(Oct. 98) |
Wales &
West |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 1999: (settled
out of court) |
|
ttc70 |
|
(Oct. 98) |
West Anglia
Great Northern |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 1999: (settled
out of court) |
|
ttc71 |
|
(Dec. 98) |
Great Western
Trains |
Railtrack’s
decision in 2nd iteration of the Summer 1999 timetable: (settled
out of court) |
|
ttc72 |
|
(Dec. 98) |
Anglia
Railways |
Railtrack’s decision
in 2nd iteration of the Summer 1999 timetable: (settled
out of court) |
|
ttc73 |
|
(Feb. 99) |
Northern
Spirit |
Railtrack’s
decision in 1st iteration of the Winter 1999 timetable: (settled
out of court) |
|
ttc74 |
|
(May 99) |
Eurostar
(U.K.) |
Railtrack’s
decision in 2nd iteration of the Winter 1999 timetable: (settled
out of court) |
|
08.06.99 |
Thameslink
Rail |
Railtrack’s
decision in 2nd iteration of the Winter 1999 timetable: Standard
hour off-peak paths Gatwick – Brighton |
||
|
ttc76 |
|
(May 99) |
ScotRail
Railways |
Railtrack’s
decision in 2nd iteration of the Winter 1999 timetable: (settled
out of court) |
|
ttc77 |
|
(May 99) |
Great Western
Trains |
Railtrack’s
decision in 2nd iteration of the Winter 1999 timetable: (settled
out of court) |
|
ttc78 |
|
(May 99) |
English Welsh
& Scottish Railway |
Railtrack’s
decision in 2nd iteration of the Winter 1999 timetable: (settled
out of court) |
|
ttc79 |
|
(Aug. 99) |
Northern
Spirit |
Railtrack’s
proposals for the Rules of the Route/Plan for 2000/01: |
|
|
|
As the matters were
solely concerned with the Rules for the Winter period 2000/01, the Committee exhorted
the parties to continue discussions;
if not resolved, Northern Spirit could bring a reference following
publication of the Winter Rules Revisions. (deferred; subsequently resubmitted as ttc86) |
||
|
16.09.99 |
English
Welsh & Scottish Railway |
Railtrack’s
proposals for the Rules of the Route/Plan for the Summer 2000 timetable: |
||
|
|
|
The Committee did not
make a determination but issued an Extraordinary Note about certain
unsatisfactory features that it had detected. The Parties were instructed to resume discussions on the basis
of a common understanding of information relating to Rules of the Route, Railtrack’s
proposed timings and the working arrangements at the affected locations. In the event of the Parties failing to
resolve the dispute they were advised to make a further jointly agreed
submission, with a request that the Dispute Hearing be reconvened. |
||
|
ttc81 |
|
(Aug. 99) |
Great Western Trains |
Railtrack’s
decision on Draft Timetable for Summer 2000: (settled
out of court) |
|
15.09.99 |
Great Western
Trains |
Railtrack’s
decision on Draft Timetable for Summer 2000: Paddington
- Worcester services |
||
|
ttc83 |
|
(Sep.
99) |
Thames Trains |
Railtrack’s
decision on Draft Timetable for Summer 2000: (settled
out of court) |
|
ttc84 |
|
(Nov. 99) |
Eurostar (U.K.) |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 2000/01: (settled
out of court) |
|
21.12.99 |
Great Western
Trains |
Railtrack’s proposals
for the Rules of the Route/Plan for Winter 2000/01: Pathing and headways |
||
|
ttc86 |
|
(Dec.
99) |
Northern
Spirit |
Railtrack’s
proposals for the Rules of the Route/Plan for Winter 2000/01: (settled
out of court) |
|
20.12.99
& 27.01.00 |
English Welsh
& Scottish Railway |
Railtrack’s
decision for the Rules of the Route/Plan for Winter 2000/01: Engineering
allowances: Camden - Rugby |
||
|
05.01.00 |
Rail Express
Systems |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: Weekly
service Waterloo –Salisbury |
||
|
12.01.00 |
Thames Trains |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: Paddington
- Oxford service |
||
|
ttc90 |
|
(Dec.
99) |
Great North
Eastern Railway |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: (settled
out of court) |
|
12.01.00 |
Great Western
Trains |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: Paddington
- Oxford - Worcester service |
||
|
ttc92 |
|
(Dec.
99) |
Freightliner |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: (settled
out of court) |
|
11.01.00 |
Great North
Eastern Railway |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: Flexing
of services to Glasgow |
||
|
ttc94 |
|
(Dec.
99) |
English Welsh
& Scottish Railway |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: (settled out of court) |
|
17.01.00 |
Northern
Spirit |
Railtrack’s
decision in respect of Bids for the Summer 2000 timetable: Application
of Performance allowances |
||
|
ttc96 |
|
(Apr.
00) |
Thames
Trains |
Railtrack’s
decision in respect of Bids for the Winter 2000/01 timetable: (settled out of court) |
|
ttc97 |
|
(Apr.
00) |
Wales
& West Passenger Trains |
Railtrack’s
decision in respect of Bids for the Winter 2000/01 timetable: (settled out of court) |
|
ttc98 |
|
(July
00) |
Anglia
Railways |
Train
Regulation Statements: Alleged that
Railtrack was not complying with the provisions of Condition H11: (settled out of court) |
|
ttc99 |
|
(July
00) |
Connex
South Eastern |
Railtrack’s proposals
for the Rules of the Route 2001/02: (settled out of court) |
|
ttc100 |
|
(July
00) |
The
Chiltern Railway Company |
Railtrack’s
proposals for the Rules of the Route 2001/02: (settled out of court) |
|
ttc101 |
|
(July
00) |
West
Anglia Great Northern |
Railtrack’s
proposals for the Rules of the Route/Plan 2001/02: (withdrawn by referrer) |
|
ttc102 |
|
(July
00) |
Silverlink |
Railtrack’s
proposals for the Rules of the Route 2001/02: (settled out of court) |
|
ttc103 |
|
(July
00) |
Great
Western Trains |
Railtrack’s
proposals for the Rules of the Route 2001/02: (settled out of court) |
|
ttc104 |
|
(July
00) |
Wales
& West Passenger Trains |
Railtrack’s
proposals for the Rules of the Route 2001/02: (settled out of court) |
|
07.12.00 |
Freightliner |
Railtrack’s
proposals for the Rules of the Route 2001/02 |
||
|
07.12.00 |
English
Welsh & Scottish Railway |
Railtrack’s
proposals for the Rules of the Route 2001/02: |
||
|
ttc107 |
|
(Aug. 00) |
Eurostar (U.K.) |
Railtrack’s
proposals for the Rules of the Route 2001/02: (settled out of court) |
|
ttc108 |
|
(Aug. 00) |
Thames
Trains |
Railtrack’s
decision to reject services for the Summer 2001 timetable: (withdrawn by the
referrer) |
|
01.11.00 |
North
Western Trains |
Railtrack’s
decision in respect of the Rules of the Plan 2001/02 |
||
|
01.11.00 |
Northern
Spirit |
Railtrack’s
decision in respect of the Rules of the Plan 2001/02 |
||
|
ttc111 |
|
(Oct. 00) |
Thames
Trains |
Railtrack’s
decision in respect of Bids for the Summer 2001 timetable: (settled out of court) |
|
ttc112 |
|
(Dec. 00) |
Great
Western Trains |
Railtrack’s
decision in respect of Bids for the Summer 2001 timetable: (settled out of court) |
|
ttc113 |
|
(Dec. 00) |
Freightliner |
Railtrack’s
decision in respect of Bids for the Summer 2001 timetable: (settled out of court) |
|
ttc114 |
|
(Dec. 00) |
English
Welsh & Scottish Railway |
Railtrack’s
decision in respect of Bids for the Summer 2001 timetable: (settled out of court) |
|
ttc115 |
|
(Mar. 01) |
Great
Western Trains |
Railtrack’s
decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court) |
|
ttc116 |
|
(Mar. 01) |
Thameslink
Rail |
Railtrack’s
decision in respect of a Spot Bid: (settled out of court) |
|
ttc117 |
|
(Mar. 01) |
Great
Western Trains |
Railtrack’s
decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court) |
|
ttc118 |
|
(May 01) |
North
Western Trains |
Railtrack’s
decision in respect of the National Rules of the Plan (section3, clause 5.3)
for the 2002 timetable: (settled out of court) |
|
ttc119 |
|
(May 01) |
Arriva
Trains Northern |
Railtrack’s
decision on proposed amendments to the Rules of the Route 2001/02: (settled out of court) |
|
ttc120 |
|
(June 01) |
English
Welsh & Scottish Railway |
Railtrack’s
decision in respect of Bids for the Winter 2001/02 timetable: (settled out of court) |
|
ttc121 |
|
(July 01) |
Great
Western Trains |
Railtrack’s
decision in respect of a proposal for possessions at Reading on 28/29.7.01: (settled out of court) |
|
ttc122 |
|
(July 01) |
Connex
South Central |
Railtrack’s decision
to withdraw section 3 guidelines for granting possessions; Southern Zone Rules of the Route 2002/03: (settled out of court) |
|
ttc123 |
|
(July 01) |
Connex
South Eastern |
Railtrack’s decision
to withdraw section 3 guidelines for granting possessions; Southern Zone Rules of the Route 2002/03: (settled out of court) |
|
ttc124 |
|
(Aug. 01) |
Thames
Trains |
Railtrack’s decision
in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
ttc125 |
|
(Aug. 01) |
Great
Western Trains |
Railtrack’s
decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
ttc126 |
|
(Aug. 01) |
Central
Trains |
Railtrack’s
decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
ttc127 |
|
(Aug. 01) |
North
Western Trains |
Railtrack’s decision
in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
ttc128 |
|
(Aug. 01) |
Great
North Eastern Railway |
Railtrack’s
decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
08.02.02 |
English
Welsh & Scottish Railway |
Railtrack’s
decision in respect of the Rules of the Route/Plan for 2002/03 [Anglo-Scottish Maintenance
Strategy on the West Coast Main Line]:
(settled out of court) |
||
|
ttc130 |
|
(Aug. 01) |
Freightliner |
Railtrack’s
decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
ttc131 |
|
(Aug. 01) |
Arriva
Trains Northern |
Railtrack’s
decision in respect of version 2 of the Rules of the Route for 2002/03: (settled out of court) |
|
|
30.11.01 |
Eurostar (U.K.) |
Railtrack’s
decision to suspend Train Slots for Eurostar night services in the Draft
Timetable for Summer 2002: |
|
|
ttc133 |
|
(Oct. 01) |
Rail
Express Systems |
Railtrack’s
decision in respect of a Spot Bid for 1S06 Royal Mail train: (settled out of court) |
|
ttc134 |
|
(Oct. 01) |
Thames
Trains |
A Railtrack
‘decision’ in respect of the Draft Timetable for Summer 2002: (settled out of court) |
|
ttc135 |
|
(Nov. 01) |
South
Central |
A Railtrack
‘decision’ in respect of the Draft Timetable for Summer 2002: (settled out of court) |
|
14.03.02 |
Arriva
Trains Northern |
Railtrack’s
decision in respect of the Rules of the Route/Plan for Winter 2002/03 |
||
|
ttc137 |
|
(Dec. 01) |
Connex
South Eastern |
Railtrack’s
decision in respect of Bids for the Summer 2002 timetable: (settled out of court) |
|
ttc138 |
|
(Dec. 01) |
Thameslink
Rail |
Railtrack’s
decision in respect of Bids for the Summer 2002 timetable: (settled out of court) |
|
ttc139 |
|
(Dec. 01) |
ScotRail
Railways |
Railtrack’s
decision in respect of Bids for the Summer 2002 timetable: (settled out of court) |
|
ttc140 |
|
(Dec. 01) |
Great
Western Trains |
Railtrack’s
decision in respect of Bids for the Summer 2002 timetable: (settled out of court) |
|
ttc141 |
|
(Dec. 01) |
Wessex
Trains |
Railtrack’s
decision in respect of the use of Platform 0 at Cardiff Central for the
Summer 2002 timetable: (settled out of court) |
|
ttc142 |
|
(Dec. 01) |
Freightliner |
Railtrack’s decision
in respect of Bids for the Summer 2002 timetable: (settled out of court) |
|
ttc143 |
|
(Mar.02) |
Great Western Trains |
Railtrack’s
decision in respect of changes to the Rules of the Route for September 2002: (settled out of court) |
|
24.05.02 |
Grand Central Railway |
Railtrack’s decision in respect of Bids for the Winter 2002 timetable: |
||
|
ttc145 |
|
(Apr.02) |
Arriva Trains Northern |
Railtrack’s decision
in respect of the Rules of the Route/Plan for the Winter Two timetable
2002/03: (settled out of court) |
|
ttc146 |
|
(Apr.02) |
Central Trains |
Railtrack’s
decision in respect of Bids for the Winter One timetable 2002/03: (settled out of court) |
|
ttc147 |
|
(Apr.02) |
Great North Eastern Railway |
Railtrack’s
decision in respect of Bids for the Winter 2002/03 timetable: (settled out of court) |
|
ttc148 |
|
(Apr.02) |
Wessex Trains |
Railtrack’s
decision in respect of Bids for the Winter 2002/03 timetable: (withdrawn by referrer) |
|
ttc149 |
|
(Apr. 02) |
English Welsh & Scottish Railway |
Railtrack’s
decision in respect of Bids for the Winter 2002/03 timetable: (settled out of court) |
|
ttc150 |
|
(May 02) |
Great Western Trains |
Railtrack’s
decision in respect of Bids for the Winter 2002 timetable: (settled out of court) |
|
ttc151 |
|
(July 02) |
Great North Eastern Railway |
Railtrack’s decision
in respect of the Rules of the Plan for 2003/04: (settled out of court) |
|
ttc152 |
|
(July 02) |
Great Western Trains |
Railtrack’s
decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court) |
|
ttc153 |
|
(July 02) |
ScotRail Railways |
Railtrack’s
decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court) |
|
ttc154 |
|
(July 02) |
West Coast Trains |
Railtrack’s
decision in respect of the Rules of the Route for 2003/04: (settled out of court) |
|
22.10.02 |
Thames Trains |
Railtrack’s decision in respect of the
Rules of the Route/Plan for 2003/04:
|
||
|
ttc156 |
|
(July 02) |
North Western Trains |
Railtrack’s decision
in respect of the Rules of the Route/Plan for 2003/04: (settled out of court) |
|
ttc157 |
|
(July 02) |
Silverlink Train Services |
Railtrack’s
decision in respect of the Rules of the Route for 2003/04: (settled out of court) |
|
ttc158 |
|
(July 02) |
Central Trains |
Railtrack’s
decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court) |
|
ttc159 |
|
(July 02) |
Great North Eastern Railway |
Railtrack’s
decision in respect of the Rules of the Route for 2003/04: (settled out of court) |
|
ttc160 |
|
(July 02) |
West Anglia Great Northern |
Railtrack’s
decision in respect of the Rules of the Route/Plan for 2003/04: (settled out of court) |
|
ttc161 |
|
20.09.02 |
Arriva Trains Northern |
Railtrack’s decision in respect of the Rules of the Route/Plan for 2003/04: |
|
|
Two determinations
were issued: Determination 161A - granted the parties
additional time to reach agreement on matters relating to Sections 5 & 7
of the Rules of the Route, and gave specific deadlines by which the parties
should refer unresolved issues back to the Committee for determination; Determination 161B -
contained decisions relating to the National Rules of the Plan |
|||
|
25.10.02 |
Arriva Trains Northern |
Unresolved
issues relating to Section 5 of the Rules of the Route for 2003/04, referred
back in accordance with Determination 161A: (settled out of court) |
||
|
ttc162 |
|
(July 02) |
English Welsh & Scottish Railway |
Railtrack’s decision
in respect of the Rules of the Route/Plan (Version 2) 2003/04: (settled out of court) |
|
ttc163 |
|
[not used] |
|
|
|
ttc164 |
|
(Aug.02) |
English Welsh & Scottish Railway |
Railtrack’s decision
in respect of Bids for the Winter Two 2002/03 timetable: (settled out of court) |
|
ttc165 |
|
(Sept.02) |
English Welsh & Scottish Railway |
National Rules
of the Plan, Section 3: possession
strategy for Dolphingstone: (settled out of court) |
|
ttc166 |
|
(Oct.02) |
Freightliner |
Railtrack’s
decision in respect of the Rules of the Route/Plan (Version 3) 2003/04: (settled out of court) |
|
ttc167 |
|
(Dec.02) |
CrossCountry Trains |
Railtrack’s decision
in respect of the Rules of the Route (Version 4) 2003/04: (settled out of court) |
|
23.01.03 |
Grand Central Railway |
Railtrack’s decision in respect of Bids
for the Summer 2003 timetable: |
||
|
ttc169 |
|
(Dec.02) |
Great North Eastern Railway |
Railtrack’s
decision in respect of the Rules of the Route/Plan (Version 4) 2003/04: (settled out of court) |
|
ttc170 |
|
(Dec.02) |
Arriva Trains Northern |
Railtrack’s
decision in respect of the Rules of the Route/Plan (Version 4) 2003/04: (withdrawn by referrer) |
|
ttc171 |
|
(Dec.02) |
Thames Trains |
Railtrack’s
decision in respect of the Rules of the Route (Version 4) 2003/04: (withdrawn by referrer) |
|
ttc172 |
|
(Dec.02) |
Freightliner |
Railtrack’s
decision in respect of Bids for the Summer 2003 timetable: (withdrawn by referrer) |
|
ttc173 |
|
(Dec.02) |
Great Western Trains |
Railtrack’s
decision in respect of Bids for the Summer 2003 timetable: (withdrawn by referrer) |
|
ttc174 |
|
(Dec.02) |
English Welsh & Scottish Railway |
Railtrack’s
decision in respect of Bids for the Summer 2003 timetable: (settled out of court) |
|
ttc175 |
|
(Apr.03) |
English Welsh & Scottish Railway |
Network Rail’s
decision in respect of Rules of the Route (Paddington re-signalling): (settled out of court) |
|
ttc176 |
|
(Apr.03) |
English Welsh & Scottish Railway |
Network Rail’s
decision in respect of Bids for the Winter One 2003/04 timetable for Anglo-Scottish
services: (settled out of court) |
|
ttc177 |
|
(Apr.03) |
English Welsh & Scottish Railway |
Network Rail’s
decision in respect of Bids for the Winter One 2003/04 timetable for other
than Anglo-Scottish services: (settled out of court) |
|
ttc178 |
|
(Apr.03) |
Freightliner |
Network Rail’s
decision in respect of Bids for the Winter One 2003/04 timetable: (settled out of court) |
|
ttc179 |
|
(Apr.03) |
Great Western Trains |
Network Rail’s
decision in respect of Bids for the Winter One 2003/04 timetable: (settled out of court) |
|
04.08.03 |
ScotRail Railways |
Network Rail’s decision in respect of the
Rules of the Route for the Winter Two period of the 2003/04 Timetable: |
||
|
|
|
|
The Committee issued
a Note of Extraordinary deliberations to explain why, for technical reasons,
it could not issue a formal determination. |
|
|
ttc181 |
|
(July 03) |
Grand Central Railway |
Railtrack’s
decision in respect of Bids for the Winter Two 2003/4 timetable: (settled out of court) |
|
29.08.03 |
Great Western Trains |
Network Rail’s decision in respect of
the Rules of the Route (Version 2) for 2004: |
||
|
ttc183 |
|
(July 03) |
The Chiltern Railway Co. |
Network Rail’s
decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court) |
|
ttc184 |
|
(July 03) |
North Western Trains |
Network Rail’s
decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court) |
|
ttc185 |
|
(July 03) |
Freightliner |
Network Rail’s
decision in respect of the Rules of the Route (Version 2) for 2004: (settled out of court) |
|
ttc186 |
|
(Aug.03) |
English Welsh & Scottish Railway |
Railtrack’s
decision in respect of Bids for the Winter Two 2003/04 timetable: (settled out of court) |
|
ttc187 |
|
(Aug.03) |
English Welsh
& Scottish Railway |
Network Rail’s
decision in respect of the Rules of the Route/Plan for 2004: (settled out of court) |
|
ttc188 |
|
(Aug.03) |
Arriva Trains Northern |
Network Rail’s
decision in respect of the Rules of the Route/Plan for 2004: (settled out of court) |
|
9/28.10.03 |
Thames
Trains |
Network Rail’s decision in respect of the
Rules of the Route for 2004: |
||
|
10.10.03 |
Silverlink Train Services |
Network Rail’s decision in respect of
the Rules of the Route for 2004: |
||
|
23.12.03 |
Freightliner Heavy Haul |
Network Rail’s decision in respect of
Bids for the Winter Two 2003/04 timetable: |
||
|
23.09.03 |
Great North Eastern Railway |
Network Rail’s decision in respect of
the Rules of the Route/Plan for 2004: |
||
|
ttc193 |
|
(Aug.03) |
English Welsh & Scottish Railway |
Network Rail’s
decision in disregard of Condition D3.7.5:
[Note: after discussion train retimed
to satisfaction of all parties]: (settled out of court) |
|
26.09.03 |
ScotRail Railways |
Network Rail’s decision in respect of
Bids for the Winter Two 2003/04 timetable: |
||
|
ttc195 |
|
(Sep.03) |
Freightliner |
Network
Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for
2004: (settled
out of court) |
|
ttc196 |
|
(Sep.03) |
Great North Eastern Railway
|
Network
Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for
2004: (settled out of court) |
|
ttc197 |
|
(Sep.03) |
English Welsh & Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route/Plan (Version 3) for
2004: (settled out of court) |
|
ttc198 |
|
(Dec.03) |
CrossCountry
Trains |
Network Rail’s
decision in respect of an amendment to the Rules of the Route for weeks 17-22
at Stafford: (settled
out of court) |
|
ttc199 |
|
(Dec.03) |
Silverlink
Train Services (London lines) |
Network Rail’s
decision in respect of an amendment to the Rules of the Route for the late
Spring Bank Holiday 2004: (settled
out of court) |
|
ttc200 |
|
(Dec.03) |
Freightliner |
Network Rail’s decision in respect of Bids
for the Summer 2004 timetable (settled out of court) |
|
ttc201 |
|
(Dec.03) |
English
Welsh & Scottish Railway |
Network Rail’s decision in respect of
Bids for the Summer 2004 timetable (settled out of court) |
|
ttc202 |
|
(Dec.03) |
Freightliner
Heavy Haul
|
Network Rail’s decision in respect of
Bids for the Summer 2004 timetable (settled out of court) |
|
29.01.04 |
Thames
Trains |
Network Rail’s decision in respect of Bids
for the Summer 2004 timetable |
||
|
ttc204 |
|
(Jan.04) |
CrossCountry
Trains |
Network Rail’s
decision in respect of an amendment to Rules of the Route for 2004: Periods 4b & 5 (Crewe-Cheadle Hulme) (settled
out of court) |
|
04.03.04 |
English
Welsh & Scottish Railway |
Adherence to acceptance procedures in
respect of a Spot Bid for 7O81: |
||
|
ttc206 |
|
(Jan.04) |
ScotRail
Railways |
Network
Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled
out of court) |
|
ttc207 |
|
(Jan.04) |
ScotRail
Railways |
Network
Rail’s decision in respect of an amendment to the Rules of the Route for
2003/04 (weeks 50 & 51): (settled
out of court) |
|
ttc208 |
|
(Jan.04) |
Freightliner |
Network
Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled
out of court) |
|
ttc209 |
|
(Jan.04) |
Great
Western Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 4) for 2004: (settled
out of court) |
|
ttc210 |
|
(Jan.04) |
Arriva
Trains Northern |
Network
Rail’s decision in respect of the Rules of the Route/Plan (Version 4) for
2004: (settled
out of court) |
|
23.03.04 |
Freightliner |
Network Rail’s decision in respect of
short notice additional possessions on the WCML: weeks 1-8, 2004 |
||
|
23.03.04 |
English
Welsh & Scottish Railway |
Network Rail’s decision in respect of
short notice additional possessions on the WCML: weeks 1-8, 2004 |
||
|
23.03.04 |
ScotRail
Railways |
Network Rail’s decision in respect of
short notice additional possessions on the WCML: weeks 1-8, 2004 |
||
|
ttc214 |
|
(Mar.04) |
Silverlink
Train Services |
Network Rail’s
decision in respect of short notice additional possessions on the WCML: weeks 2 & 4, 2004 (withdrawn
by referrer) |
|
ttc215 |
|
(Mar.04) |
North
Western Trains |
Extended
Disruption (Condition H7): Damaged Network at Bootle Branch Jcn (settled
out of court) |
|
ttc216 |
|
(Feb.04) |
Silverlink
Train Service |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (lapsed when
Silverlink submitted reference NV65 to the Network and Vehicle Change
Committee) |
|
ttc217 |
|
(Feb.04) |
Arriva
Trains Wales |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled
out of court) |
|
ttc218 |
|
(Feb.04) |
ScotRail
Railways |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc219 |
|
(Feb.04) |
Freightliner
Heavy Haul |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc220 |
|
(Feb.04) |
Arriva
Trains Northern |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled
out of court) |
|
ttc221 |
|
(Feb.04) |
Great
Northern Eastern Railway |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc222 |
|
(Feb.04) |
Central
Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc223 |
|
(Feb.04) |
North
Western Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc224 |
|
(Feb.04) |
CrossCountry
Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2005 (settled out of court) |
|
ttc225 |
|
(Apr.04) |
English
Welsh & Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route for WCML, August 2005 (settled out of court) |
|
ttc226 |
|
(May 04) |
ScotRail
Railways |
Network
Rail’s decision in respect of the Rules of the Route (Versions 3 & 4) for
2005 (settled out of court) |
|
ttc227 |
|
(June 04) |
Freightliner |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court) |
|
ttc228 |
|
(June 04) |
CrossCountry
Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court) |
|
ttc229 |
|
(June 04) |
Arriva
Trains Northern |
Network
Rail’s amendment in accordance with Condition D2.1.9 in respect of section 7
of the Rules of the Route for 2005 (settled out of court) |
|
ttc230 |
|
(Feb.04) |
English Welsh & Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court) |
|
ttc231 |
|
(July 04) |
English Welsh & Scottish Railway |
Network
Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules
of the Route for 2005 (settled out of court) |
|
01.09.04 |
CrossCountry Trains |
Network Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 |
||
|
ttc233 |
|
(Aug.04) |
West Coast Trains |
Network
Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules
of the Route for 2005 (settled out of court) |
|
ttc234 |
|
(Aug.04) |
English Welsh & Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route for 2005 – additional
possessions in weeks 31 & 32 (settled out of court) |
|
ttc235 |
|
(Aug.04) |
Freightliner |
Network
Rail’s decision in respect of the Rules of the Route (Version 4) for 2005 (settled out of court) |
|
ttc236 |
|
(Aug.04) |
CrossCountry Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005,
Periods 0, A & B (settled out of court) |
|
ttc237 |
|
(Aug.04) |
Arriva Trains Northern |
Network
Rail’s amendment in accordance with Condition D2.1.9 in respect of the Rules of
the Route for 2005 (settled out of court) |
|
ttc238 |
|
(Aug.04) |
North Western Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 4) for 2005,
Periods C & D (settled out of court) |
|
ttc239 |
|
(Aug.04) |
CrossCountry Trains |
Network
Rail’s decision (on 10 August 2004) in respect of the Rules of the Route for
2005 (settled out of court) |
|
ttc240 |
|
(Aug.04) |
Freightliner Heavy Haul |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc241 |
|
(Aug.04) |
ScotRail Railways |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
12.10.04 |
Great Western Trains |
Network Rail’s decision in respect of Bids for the December 2004 timetable |
||
|
ttc243 |
|
(Aug.04) |
GB Railfreight |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
12.10.04 |
First Great Western Link |
Network Rail’s decision in respect of Bids for the December 2004 timetable |
||
|
ttc245 |
|
(Aug.04) |
Freightliner |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc246 |
|
(Aug.04) |
Wessex Trains |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc247 |
|
(Aug.04) |
South Eastern Trains |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc248 |
|
(Aug.04) |
Arriva
Trains Northern |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc249 |
|
(Aug.04) |
Eurostar (U.K.) |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
ttc250 |
|
(Aug.04) |
English Welsh & Scottish Railway |
Network
Rail’s decision in respect of Bids for the December 2004 timetable (settled out of court) |
|
06.01.05 |
Great Western Trains |
Network Rail’s decision in respect of further changes in weeks 1 & 2 to the Rules of the Route for 2005 |
||
|
25.02.05 |
Arriva Trains Northern |
Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Settle & Carlisle line |
||
|
ttc253 |
|
25.02.05 |
Arriva Trains Northern |
Network Rail’s decision in respect of further changes to the Rules of the Route for 2005 for the Saltburn branch |
|
|
The
Committee commenced a hearing of this reference from Arriva Trains Northern,
but it was soon apparent that much of the information that was emerging
during the course of the hearing had not been fully shared between the
Parties concerned at the appropriate point in time during the consultation
period or subsequently. The Committee
therefore instructed the Parties to enter into full and proper dialogue on
all relevant issues and, after they had reached a common understanding of the
facts, to advise the Committee which elements of the dispute were still
unresolved, meanwhile the Committee adjourned the hearing. |
|||
|
ttc254 |
|
(Dec.04) |
CrossCountry Trains |
Network Rail’s decision in respect of
further changes to the Rules of the Route for 2005 |
|
ttc255 |
|
(Dec.04) |
LTS Rail |
Network
Rail’s decision in respect of further changes to the Rules of the Route for
2006 (settled out of court) |
|
02.03.05 |
Silverlink Train Services |
Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 |
||
|
ttc257 [TTP01] |
|
(Dec.04) |
Northern Rail (East) |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc258 |
|
(Dec.04) |
New Southern
Railway |
Network Rail’s decision in respect of
the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc259 [TTP02] |
|
(Dec.04) |
First ScotRail |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc260 |
|
(Dec.04) |
West Anglia Great Northern |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc261 |
|
(Dec.04) |
Heathrow Connect |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc262 |
|
[20.07.05] |
English Welsh & Scottish Railway PENDING at 15.04.05; and
subsequently heard by a Timetabling Panel on 20.07.05 |
Network Rail’s decision in respect of the Rules of the Route
(Version 2) for 2006 |
|
ttc263 |
|
(Dec.04) |
Freightliner |
Network
Rail’s decision in respect of the Rules of the Route (Version 2)[for
Shenfield – Norwich route] for 2006 (settled out of court) |
|
ttc264 |
|
[22.08.05] |
Freightliner PENDING at 15.04.05; and
subsequently heard by a Timetabling Panel on 22.08.05 |
Network Rail’s decision in respect
of the Rules of the Route (Version 2) for 2006 |
|
23.02.05 |
Arriva Trains
Wales |
Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 |
||
|
ttc266 [TTP05] |
|
(Dec.04) |
Great North Eastern Railway
|
Network Rail’s
decision in respect of items in Section 7 of the Rules of the Route (Version
2) for 2006 (settled out of court) |
|
ttc267 |
|
(Dec.04) |
Northern Rail (West) |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc268 |
|
(Dec.04) |
First/Keolis Transpennine
Express |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc269 |
|
(Dec.04) |
South Eastern Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc270 |
|
(Jan.05) |
CrossCountry Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
17.02.05 |
West Coast Trains |
Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 |
||
|
ttc272 [TTP06] |
|
(Jan.05) |
Great North Eastern Railway |
Network
Rail’s decision in respect of items in Sections 4 & 5 of the Rules of the
Route (Version 2) for 2006 (settled out of court) |
|
ttc273 [TTP07] |
|
(Dec.04) |
Freightliner Heavy Haul |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc274 |
|
(Jan.05) |
Eurostar (U.K.) |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
11.03.05&29.03.05 |
Great Western Trains |
Network Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 |
||
|
ttc276 |
|
(Jan.05) |
First ScotRail |
Network
Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court) |
|
ttc277 |
|
(Jan.05) |
Great Westerrn Trains |
Network
Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court) |
|
ttc278 |
|
(Jan.05) |
Eurostar (U.K.) |
Network
Rail’s decision in respect of Bids for the June 2005 timetable (settled out of court) |
|
ttc279 |
|
(Feb.05) |
English Welsh &
Scottish Railway |
Network
Rail’s decision in respect of the changes other than twice yearly to the
Rules of the Route for 2006 (settled out of court) |
|
ttc280 |
|
(Feb.05) |
Northern Rail (East) |
Network
Rail’s decision in respect of the changes other than twice yearly to the
Rules of the Route for 2006 (settled out of court) |
|
ttc281 [TTP08] |
|
(Jan.05) |
CrossCountry Trains |
Network
Rail’s decision in respect of the Rules of the Route (Version 2) for 2006 (settled out of court) |
|
ttc282 |
|
(Feb.05) |
Freightliner Heavy Haul |
Network
Rail’s decision in respect of changes (in a batching document) to the Rules
of the Route for 2006 (settled out of court) |
|
ttc283 |
|
(Feb.05) |
GB Railfreight |
Network
Rail’s decision in respect of changes (in a batching document) to the Rules
of the Route for 2006 (settled out of court) |
|
ttc284 |
|
(Feb.05) |
CrossCountry Trains |
Network
Rail’s decision in respect of revised proposals for changes in weeks 11/12 of
the Rules of the Route 2005 (settled out of court |
|
ttc285 [TTP09] |
|
(Jan.05) |
First ScotRail |
Network
Rail’s decision in respect of changes (in a batching document) to the Rules
of the Route for 2006 (settled out of court) |
|
ttc286 |
|
(Feb.05) |
English Welsh &
Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court) |
|
ttc287 [TTP07] |
|
(Mar.05) |
Freightliner Heavy Haul |
Network
Rail’s decision in respect of the Rules of the Route (Version 3) for 2005 (settled out of court) |
|
ttc288 |
|
(Mar.05) |
Northern Rail (East) |
Network
Rail’s decision in respect of the Rules of the Route (batching document 3)
for 2006 (settled out of court) |
|
ttc289 |
|
(Mar.05) |
English Welsh &
Scottish Railway |
Network
Rail’s decision in respect of the Rules of the Route (batching document 2)
for 2006 (settled out of court) |
|
ttc290 |
|
[20.07.05] |
English Welsh & Scottish
Railway PENDING at 15.04.05; and
subsequently heard by a Timetabling Panel on 20.07.05 |
Network Rail’s decision in respect of the Rules of the Route